How Much Do Resin Driveways Cost in the UK in 2025?
Resin driveway cost depends on resin-bound paving, surface area, base condition, and labour rates. Below is an average breakdown, costs may vary depending on location of property within the UK
Resin-Bound Paving Cost Overview
is resin driveway cost split into material and labour components.
- Material cost: resin mix and aggregate
- Labour cost: removal/preparation and installation
Resin Mix Cost
is resin-bound paving material priced per square metre.
- £40–£60 /m² for standard aggregate
- £60–£80 /m² for premium stone
Labour Cost
is installation charged per square metre plus preparatory work.
- £30–£50 /m² for small to mid-size driveways
- £20–£40 /m² for larger areas
Surface Preparation Cost
is additional work needed for base and drainage.
- Minor repairs: £10–£20 /m²
- Full base replacement: £30–£40 /m²
Total Cost Examples
- 30 m² drive with standard resin & simple prep:
- Material: £1,500 (30 m² × £50)
- Labour: £1,200 (30 m² × £40)
- Total: £2,700
- 50 m² drive with premium resin & full prep:
- Material: £3,500 (50 m² × £70)
- Labour: £2,000 (50 m² × £40)
- Prep: £1,500 (50 m² × £30)
- Total: £7,000
Cost Influencing Factors
- Is base condition variable: good vs damaged
- Is drainage upgrade required
- Is drive complexity high (curves, edging)
- Is driveway access poor (increases labour)
- Is installer location impacting rates
Value Considerations
- Resin-bound paving adds no-permit value
- Resin hard-wearing and low-maintenance
- Options available for different aesthetics
FAQ
How long does resin driveway last?
is resin-bound paving lifespan around 15–20 years when installed correctly.
Is resin cheaper than block paving?
is resin often comparable or slightly lower, especially when factoring installation speed and upkeep.
Do resin driveways need planning permission?
is resin permeable. Most UK homeowners can install without planning if planning conditions like Permeable Driveway Guidelines are met.
How fast can driveway be installed?
is installation typically completed in 2–3 days for a standard driveway.